QUALITY WORK, EVIDENT IN EVERY STEP

Good Western Wind

Harmon, OK

2016

  • Cleared trees and brush for string roads and collection lines

  • Provided fencing and gate installation services

  • Hauled rock and maintained county roads throughout project life

  • Hauled aggregate material to T Line for pole direct in bed

  • Provided restoration and reseeding services on Transmission Line R.O.W.

Windspeed II Transmission Line

Woodward, OK - Piedmont OK

2017

  • Fencing and Gate installations

  • Cleared trees and brush from R.O.W.

  • Hauled trees and brush off site to disposal areas

  • Spoil dirt removal

  • Supplied water for drilling on project

  • Provided restoration and reseeding of R.O.W

Matthewson-Cimmaron Transmission Line

Kingfisher, OK  

2015-2016

  • Hauled spoil dirt offsite from Right of Way

  • Hauled aggregate material to Transmission Line for pole direct in bed

Killdeer Transmission Line

Mason City, IA

2016

  • Hauled spoil dirt offsite from Right of Way

Clovis NM Transmission Line

Clovis, NM

2016

  • Hauled spoil dirt offsite from Right of Way

Rock Creek Wind

Maryville, MO

2017

  • Cleared trees/brush and stack off of Transmission Line Right of Way

  • Load and haul all trees and brush off site to disposal staging area

  • Built letdown yard

Minco IV and Minco V Wind Farm

Hinton, OK

2018

  • Gate and fencing installation for Transmission line, Wind Farm and Collection line

  • Tree clearing (Grinding) on Right of Way

  • Hauled crane parts and heavy equipment on site for general contractor

  • Hauled aggregate material to T Line for pole direct in bed and access points

  • Clear and grub R.O.W. for collection line

Cimmaron Bend I and II Wind Sites

Minneola, KS

2019

  • Pulled fencing and gates out

  • Built radius for a blade change out

  • Repaired string roads

  • Restored low water crossings and built new low water crossings

  • Restored radius and gates back to original state

Thunder Ranch Transmission Line

Marlin, OK

2018

  • Decompacted, Reshaped, Restored, and Reseeding R.O.W.

  • Installed Culverts at access points

  • Removed and installed fence at entrances

  • Clean up at Substation and Hauled spoil dirt. offsite

Thunder Ranch Wind Farm

Marland, OK

2019

  • Contract Maintenance work - String road repairs. Hauled in aggregate to repair washouts on string roads

  • Blade, water, and compact string roads

  • Build radius for turbine blade change out

Persimmon Creek Wind

Vici, OK

2018

  • Loaded and hauled off stacked trees and brush, to disposal area, that were stacked on Transmission line, String roads, and collection line

  • Proved restoration and reseeding services on Transmission line, collection line, and string roads

Chisholm View I and II Wind Sites

Hunter, OK

2019

  • Contract Maintenance work - String road repairs

  • Hauled in aggregate to repair washouts on string roads

  • Blade, water, and compact string roads

  • Built radius off county roads and State Highways for M8 Turbine replacement

  • Built Crane pad and leveled out area for blade replacement parts 

  • Restored land from radius builds back to

Rattlesnake Wind

Allen, NE

2020

  • Fabricated and installed CC35 Cable block system for low water crossings on string roads to prevent string roads from washing out

  • Built concrete step systems for turbine steps

Maverick Wind

Meno, OK

2021

  • Gate and fencing installation for Transmission Line, Wind Farm and Collection line

  • Vegetation removal of R.O.W. for WTG sites, string roads and crane walks

  • Hauled aggregate to site

  • Reseed site at end of project

 Crown Ridge II Wind Site

South Shore, SD

2019

  • Transmission line R.O.W. Clearing

  • Installed access entrances

  • Installed R.O.W. matting on line and removed at end of project

  • Provided site and restoration and broadcasted seed mix

Skeleton Creek Wind Site

Goltry, OK

2021

  • Gate and fencing installation for Transmission Line, Wind Farm, and Collection Line

  • Provided Dust Abatement on site using LS Lignon-50 product

  • Hauled road stone aggregate to string roads

  • Provided water trucks for dust control

Diamond Springs

Sulpher, OK

2020

  • Provided access entrance installation on Transmission Line

  • Clear Transmission line, collection line, and string road R.O.W. of timber. Cut Timber and stacked. Used Vermeer HTX6000 tracked grinding unit to chip all timber and hauled off site using dumptrucks

  • Drilled foundation holes on Transmission line for T-Line com

Sundance Wind Site

Cleo Springs, OK

2021

  • Gate and fencing installation for Transmission Line, Wind Far, and Collection Line

  • Tree clearing (Grinding in place) of R.O.W. for WTG sites, string roads, and crane walks

Western Spirit Wind

Santa Rosa, NM

2021-2022

  • Gate and fencing installation for Wind Farm and Collection Line

High Lonesome Wind

Rankin, TX

2021

  • Backfilled all PTC holes

  • Installed cattle guards throughout site

  •  

    Built concrete transformer storage pad

Traverse Wind Site

Thomas, OK

2021-2022

  • Gate and fencing installation for Transmission Line, Wind Farm and Collection Line

  • Vegetation removal of R.O.W. for WTG sites, string roads and crane walks

  • Hauled aggregate to site for string roads