CROSSTIMBER PROJECTS
QUALITY WORK, EVIDENT IN EVERY STEP
Good Western Wind
Harmon, OK
2016
-
Cleared trees and brush for string roads and collection lines
-
Provided fencing and gate installation services
-
Hauled rock and maintained county roads throughout project life
-
Hauled aggregate material to T Line for pole direct in bed
-
Provided restoration and reseeding services on Transmission Line R.O.W.
Windspeed II Transmission Line
Woodward, OK - Piedmont OK
2017
-
Fencing and Gate installations
-
Cleared trees and brush from R.O.W.
-
Hauled trees and brush off site to disposal areas
-
Spoil dirt removal
-
Supplied water for drilling on project
-
Provided restoration and reseeding of R.O.W
Matthewson-Cimmaron Transmission Line
Kingfisher, OK
2015-2016
-
Hauled spoil dirt offsite from Right of Way
-
Hauled aggregate material to Transmission Line for pole direct in bed
Killdeer Transmission Line
Mason City, IA
2016
-
Hauled spoil dirt offsite from Right of Way
Clovis NM Transmission Line
Clovis, NM
2016
-
Hauled spoil dirt offsite from Right of Way
Rock Creek Wind
Maryville, MO
2017
-
Cleared trees/brush and stack off of Transmission Line Right of Way
-
Load and haul all trees and brush off site to disposal staging area
-
Built letdown yard
Minco IV and Minco V Wind Farm
Hinton, OK
2018
-
Gate and fencing installation for Transmission line, Wind Farm and Collection line
-
Tree clearing (Grinding) on Right of Way
-
Hauled crane parts and heavy equipment on site for general contractor
-
Hauled aggregate material to T Line for pole direct in bed and access points
-
Clear and grub R.O.W. for collection line
Cimmaron Bend I and II Wind Sites
Minneola, KS
2019
-
Pulled fencing and gates out
-
Built radius for a blade change out
-
Repaired string roads
-
Restored low water crossings and built new low water crossings
-
Restored radius and gates back to original state
Thunder Ranch Transmission Line
Marlin, OK
2018
-
Decompacted, Reshaped, Restored, and Reseeding R.O.W.
-
Installed Culverts at access points
-
Removed and installed fence at entrances
-
Clean up at Substation and Hauled spoil dirt. offsite
Thunder Ranch Wind Farm
Marland, OK
2019
-
Contract Maintenance work - String road repairs. Hauled in aggregate to repair washouts on string roads
-
Blade, water, and compact string roads
-
Build radius for turbine blade change out
Persimmon Creek Wind
Vici, OK
2018
-
Loaded and hauled off stacked trees and brush, to disposal area, that were stacked on Transmission line, String roads, and collection line
-
Proved restoration and reseeding services on Transmission line, collection line, and string roads
Chisholm View I and II Wind Sites
Hunter, OK
2019
-
Contract Maintenance work - String road repairs
-
Hauled in aggregate to repair washouts on string roads
-
Blade, water, and compact string roads
-
Built radius off county roads and State Highways for M8 Turbine replacement
-
Built Crane pad and leveled out area for blade replacement parts
-
Restored land from radius builds back to
Rattlesnake Wind
Allen, NE
2020
-
Fabricated and installed CC35 Cable block system for low water crossings on string roads to prevent string roads from washing out
-
Built concrete step systems for turbine steps
Maverick Wind
Meno, OK
2021
-
Gate and fencing installation for Transmission Line, Wind Farm and Collection line
-
Vegetation removal of R.O.W. for WTG sites, string roads and crane walks
-
Hauled aggregate to site
-
Reseed site at end of project
Crown Ridge II Wind Site
South Shore, SD
2019
-
Transmission line R.O.W. Clearing
-
Installed access entrances
-
Installed R.O.W. matting on line and removed at end of project
-
Provided site and restoration and broadcasted seed mix
Skeleton Creek Wind Site
Goltry, OK
2021
-
Gate and fencing installation for Transmission Line, Wind Farm, and Collection Line
-
Provided Dust Abatement on site using LS Lignon-50 product
-
Hauled road stone aggregate to string roads
-
Provided water trucks for dust control
Diamond Springs
Sulpher, OK
2020
-
Provided access entrance installation on Transmission Line
-
Clear Transmission line, collection line, and string road R.O.W. of timber. Cut Timber and stacked. Used Vermeer HTX6000 tracked grinding unit to chip all timber and hauled off site using dumptrucks
-
Drilled foundation holes on Transmission line for T-Line com
Sundance Wind Site
Cleo Springs, OK
2021
-
Gate and fencing installation for Transmission Line, Wind Far, and Collection Line
-
Tree clearing (Grinding in place) of R.O.W. for WTG sites, string roads, and crane walks
Western Spirit Wind
Santa Rosa, NM
2021-2022
-
Gate and fencing installation for Wind Farm and Collection Line
High Lonesome Wind
Rankin, TX
2021
-
Backfilled all PTC holes
-
Installed cattle guards throughout site
-
Built concrete transformer storage pad
Traverse Wind Site
Thomas, OK
2021-2022
-
Gate and fencing installation for Transmission Line, Wind Farm and Collection Line
-
Vegetation removal of R.O.W. for WTG sites, string roads and crane walks
-
Hauled aggregate to site for string roads